Skip to main content
City of Albuquerque
File #: EC-20-51   
Type: Executive Communication Status: Approved
File created: 3/16/2020 In control: City Council
Final action: 4/6/2020
Enactment date: Enactment #:
Title: Mayor's Recommendation of AECOM Technical Services, Inc. for Engineering Consultants for McMahon Boulevard Widening - Kayenta Street to Unser Boulevard
Attachments: 1. EC-51

     

 

 

INTER-OFFICE MEMORANDUM                                                                                    DATE:  January 24, 2020

 

TO:                                          Patrick Davis, President, City Council

 

FROM:                     Timothy M. Keller, Mayor

 

SUBJECT:                     title

Mayor's Recommendation of AECOM Technical Services, Inc. for Engineering Consultants for McMahon Boulevard Widening - Kayenta Street to Unser Boulevard

body

 

The Selection Advisory Committee (SAC) met on January 22, 2020 to consider the following project:

 

Project:                     Project No. 7226.90; Engineering Consultants for McMahon Boulevard Widening - Kayenta Street to Unser Boulevard

 

Agency:                     Department of Municipal Development

 

Three proposals were received in response to the Request for Proposals.

                     

Project Description: Design and construction of the roadway widening of McMahon Boulevard, from Kayenta Street to Unser Boulevard. This project includes reconstruction of the existing roadway section of McMahon Boulevard. The required infrastructure consists of paving, signing and striping, curb and gutter, ADA compliant sidewalk, multi-use trail, bike lanes, storm drain improvements, retaining wall structures, channel and slope stabilization, street lighting, traffic operations analysis, utility relocation, and traffic signal design and modification. The project will require geotechnical testing, pavement evaluation, drainage analysis, public involvement, topographical survey, property legals and exhibits, construction management, and material testing including quality control and quality assurance. (Approximately 1.5 miles)

 

The Committee made the following recommendation:

 

AECOM Technical Services, Inc.

Souder, Miller, & Associates

T.Y. Lin International

 

The Cover Analysis, Score-Sheet Compilation and Minutes of the SAC Meeting are attached.

 

Therefore, in accordance with Section 14-7-2-1 et seq, ROA 1994, the following is my consultant selection recommendation concerning the procurement of professional services for the above listed project:

 

AECOM Technical Services, Inc.

 

Mayor's Recommendation of AECOM Technical Services, Inc. for Project No. 7226.90; Engineering Consultants for McMahon Boulevard Widening - Kayenta Street to Unser Boulevard.

 

This recommendation is being forwarded for Council consideration and action.

 

 

Approved:                                                                                                                               Approved as to Legal Form:

 

 

_____________________________                                                               ________________________________

Sarita Nair, JD, MCRP                        Date                                                               Esteban A. Aguilar, Jr.                               Date

Chief Administrative Officer                                                                           City Attorney

 

 

 

Recommended:

 

 

____________________________

Patrick Montoya, Director                       Date

Department of Municipal Development

 

 

 

MIM

 

Attachments:

 

Cover Analysis

Composite SAC Evaluation Form

Minutes of the SAC Meeting