City of Albuquerque
File #: R-21-143   
Type: Resolution Status: Enacted
File created: 4/5/2021 In control: City Council
Final action: 5/3/2021
Enactment date: 5/20/2021 Enactment #: R-2021-023
Title: Adopting The Juan Tabo Connectivity Study, Making The Recommendations Within The Study Policy Priorities For Juan Tabo Boulevard In The Vicinity Of Eubank Boulevard, Southern Boulevard And The Tijeras Arroyo (Harris)
Attachments: 1. R-143, 2. R-143 Exhibit A - COA Juan Tabo Connectivity Study FINAL, 3. R-143final
Date Action ByActionResultAction Details
5/20/2021 City Clerk Published  Action details
5/15/2021 Mayor Not Signed by the Mayor  Action details
5/10/2021 City Council Sent to Mayor for Signature  Action details
5/3/2021 City Council PassedPass Action details
4/19/2021 City Council Accepted with a Recommendation Do Pass  Action details
4/14/2021 Land Use, Planning, and Zoning Committee Sent to Council with a recommendation of Do PassPass Action details
4/5/2021 City Council Introduced and Referred  Action details
4/5/2021 President Referred  Action details

CITY of ALBUQUERQUE

TWENTY FOURTH COUNCIL

 

 

COUNCIL BILL NO.             R-21-143                   ENACTMENT NO.   ________________________

 

SPONSORED BY:                     Don Harris

 

 

RESOLUTION

title

Adopting The Juan Tabo Connectivity Study, Making The Recommendations Within The Study Policy Priorities For Juan Tabo Boulevard In The Vicinity Of Eubank Boulevard, Southern Boulevard And The Tijeras Arroyo (Harris)

body

ADOPTING THE JUAN TABO CONNECTIVITY STUDY, MAKING THE RECOMMENDATIONS WITHIN THE STUDY POLICY PRIORITIES FOR JUAN TABO BOULEVARD IN THE VICINITY OF EUBANK BOULEVARD, SOUTHERN BOULEVARD AND THE TIJERAS ARROYO.

WHEREAS, Juan Tabo Boulevard (“Juan Tabo”) connects many residential areas with the larger roadway network; and

WHEREAS, there are no direct east-west connections south of Southern Boulevard to Eubank Boulevard; and

WHEREAS, Eubank Boulevard provides access to many major employers located at Kirtland Airforce Base, Sandia National Laboratories, and Sandia Science and Tech Park; and

WHEREAS, the lack of connectivity results in heavy cut through traffic for some residential neighborhoods and puts pressure on the main intersections; and

WHEREAS, there are significant physical barriers to creating an additional east- west connection; and

WHEREAS, Juan Tabo Connectivity Study considered five alternatives, plus a No-Build Alternative; and

WHEREAS, the study held two public meetings and were in contact with the following stakeholders: Kirtland Air Force Base, Sandia National Laboratories, Sandia Science and Tech Park, Albuquerque Public Schools, State Land Office, Eastside Developers, Inc., Four Hills Community LLC, South Pointe Village MHC Inc., Albuquerque Metropolitan Flood Control Authority (AMAFCA), City of Albuquerque Open Space, Sage Land Consultants, Mid-Region Council of Governments, Public Service Company of New Mexico (PNM); and

WHEREAS, the study scored each of the alternatives on the following criteria: Traffic, Cut-Through, Safety, Utilities, Right-of-Way, Cost, Development, Bio-Zone, and Landfill; and

WHEREAS, the Study concluded that none of the five roadway alternatives scored higher than the No-Build Alternative; and

WHEREAS, the Study recommended that if the No-Build Alternative is selected to move forward, the following list of possible projects could be considered to improve the study area:

o                     Improve existing infrastructure - the existing roadway network can be analyzed, and improvements can be identified to increase the capacity

o                     Multi-use path - construct a multi-use path instead of a roadway to create a direct walking/biking route from Juan Tabo Boulevard to Eubank Boulevard

o                     Transit - work with ABQRide to add transit stops along Juan Tabo Boulevard and takes riders to Eubank Boulevard

o                     Ride-Share Program - work with KAFB and Sandia National Laboratories to implement a ride-share program to carpool to work

o                     NTMP Willow Wood Project - implement the City of Albuquerque Neighborhood Traffic Management Program project that looked at diverting cut-through traffic from the Willow Wood Community. The project analyzed different alternatives one being the vacation of right-of-way and installing a gate at Tony Sanchez and Gibson Boulevard; and 

WHEREAS, adoption of the Study will help guide improvements to connectivity and existing infrastructure in the vicinity of Juan Tabo Boulevard, Eubank Boulevard, Southern Boulevard, and the Tijeras Arroyo; and                     

WHEREAS, the Juan Tabo Connectivity Study (“the Study”) is attached to this legislation as “Exhibit A”; and

WHEREAS, the recommendations in this plan further several goals and policies within the Albuquerque/Bernalillo County Comprehensive Plan, particularly in the Transportation (Ch. 6) and Urban Design (Ch. 7) Chapters.

BE IT RESOLVED BY THE COUNCIL, THE GOVERNING BODY OF THE CITY OF ALBUQUERQUE:

SECTION 1. The City Council hereby adopts The Juan Tabo Connectivity Study, attached hereto as Exhibit A, to guide considerations of improvements to connectivity and existing infrastructure in the vicinity of Juan Tabo Boulevard, Eubank Boulevard, Southern Boulevard, and the Tijeras Arroyo.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 